Take Action Now:
The NSW Government has approved Moolarben Underground 4 mining – pushing longwalls into the most fragile section of The Drip and Goulburn River gorge, despite critical groundwater and ecological data still missing.
Yancoal admits damage to The Drip cannot be offset, yet monitoring is left to the mine without independent oversight. This risks a Juukan Gorge-style disaster. The independent panel has said that if any data shows movement outside what has been approved, the mining must to stop
✅ Monitoring ≠ protection - it must be transparent, real-time, and publicly reported
✅ Yancoal is entirely in charge of monitoring - "fox guarding the henhouse"
✅ Enforce a halt if conditions are breached
The decision is made – now hold them accountable. Send a quick message to NSW Ministers:

New Extraction Plan Underground 4 (UG4)
In 2007 the very large Yancoal/Moolarben Mine Stage 1 was approved to allow underground mining operations within 200 metres of the Goulburn River and surrounding fragile sandstone cliffs and gorges. The project threatens key cultural landmarks including the iconic natural feature known as The Drip, sacred Wiradjuri women's places and an original Brett Whiteley rock painting created in the 1970s by Brett and his daughter Arkie under a sandstone overhang.
The Conditions of Approval for the underground mine require:
- "nil impact to The Drip water supply" and
- "negligible impact or environmental consequences on the Goulburn River."
However, once the damage is done it is irreversible. Mining within 2 kilometres of this sensitive reach of the Goulburn River is an unacceptable risk.
In June 2026, the NSW Department of Planning approved the Extraction Plan for the final longwall panels (LW9–14) – the panels closest to the Goulburn River corridor – despite critical groundwater, geological and ecological information still being outstanding. Mining is due to commence in September this year (2026) continuing until September 2028.
This represents the greatest mining threat so far to the integrity and stability of The Drip gorge and Goulburn River.
Key threats from this underground mining within 200 metres of the river bed and fragile sandstone cliffs and gorges:
- Collapsed longwall tunnels have caused far field movements of the earth surface up to 2 kms
- Valley closure (upsidence) - where the gorge walls pinch together and push the riverbed upward, threatening Arch Rock, pagodas and Corner Gorge (the closest formation, 400 metres from mining)
- Subsidence could destabilise the fragile sandstone landscape in and around sensitive areas of Goulburn River National Park, making The Drip walking track and river area unsafe for recreational and visitor use
- Underground mining risks fracturing and draining the upper aquifers (groundwater) that flow to the Goulburn River, removing critical base flows in times of drought
- Potential to crack the river and reverse surface and groundwater flow into the mine
- The Brett Whiteley mural on The Drip walk is currently managed by Goulburn River National Park. Yancoal's extraction plan (Moolarben UG4) comes within 200m of the river and could destabilise the area to a point where public access would be removed for safety. The mine's approval requires 'nil impact' on The Drip gorge — to achieve this, a 2km buffer would be needed.
The approval reveals a flawed "staged" process:
The Independent Expert Advisory Panel for Mining (IEAPM) recommended water monitoring bores collect baseline information in preparation for this mining phase. These were only installed in October 2025 - after mining had already passed earlier panels. Crucial groundwater interaction data has still not been provided and is not publicly available.
Monitoring is not protection. Under the approval, Yancoal is entirely in charge of monitoring its own impacts - the fox guarding the henhouse. Monitoring must be independent, real-time, and publicly reported. While the Department's panel has stated that mining must stop if movement exceeds approved limits, the only consequence for breaching conditions is a fine.
The five 1-2 km longwall panels are to be extracted starting at the closest point to the river corridor - any damage will be irreversible and occur at the beginning of mining.
Any "legal fine" could not cover the loss of this iconic natural landscape, loved by many. This risks a Juukan Gorge-style disaster in the Mudgee region.
Mining within 2 kilometres of the Goulburn River is an unacceptable risk.
The Drip Gorge is a significant place for the local Wiradjuri People and should be protected.
Key Links:
“The risk of rockfalls and cliff collapses would be too high to allow public access along the relevant gorge section during and for some significant period after completion of longwall mining“
Pells Report, Engineering Consultants
“It’s really shocking… It is just awfully close – I think we are traversing that irreversible impact danger zone.“
Sue Higginson, Greens MLC
What is an Extraction Plan?
An extraction plan is used to manage subsidence associated with underground coal mining and is prepared after development consent is given. It’s not created to support the environmental impact assessment process or to obtain consent. The plan is primarily an operational document used by mining companies and regulators to ensure compliance and provide transparency to the community.
It cannot expand the mining area or propose any activities that increase subsidence or environmental impacts beyond what is approved. The plan describes how operations will be carried out, monitored, managed, and reported. While the plan may reduce mining intensity or impacts, it cannot lower impacts beyond what’s permitted. Any changes to the approved operations require a modification application.






